Greater Peoria Sanitary District
2322 S. Darst Street Peoria, IL 61607

Engineering General Specs

SECTION 001

DESIGN CRITERIA FOR SANITARY SEWERS

  • Design Standards 001-1
  • Plans, Specifications and Permits 001-1
  • Capacities of Sewers 001-1
  • Slopes of Sewers 001-2
  • Manholes 001-2
  • Lampholes 001-2
  • Pipe Protection 001-2
  • Staking for Sewerage Systems 001-3
  • Construction Inspection 001-4
  • Special Conditions 001-4
  • Location of Public Sewers 001-4
  • Easements 001-4

SECTION 017

LAWS AND REGULATIONS

  • Laws and Regulations 017-1
  • Safety and Health Regulations 017-2
  • Requirements for Greater Peoria Sanitary District Employment Employment Opportunity 017-2

SECTION 019

CONTRACTORS INSURANCE

  • Contractor’s Insurance 019-1
  • Proof of Carriage of Insurance 019-2
  • Contract Security 019-2

SECTION 021

GENERAL CONDITIONS

  • Definitions 021-1
  • Plans and Specifications 021-2
  • Materials, Workmanship and Inspection 021-3
  • Subcontracting 021-4
  • Permits, Surveys and Compliance with Laws 021-3
  • Utilities 021-4
  • Protection of Work 021-4
  • Use of Job Site and Boundaries of Work 021-4
  • Damages 021-4
  • Responsibility of Contractor 021-5
  • Notifications by Contractor 021-5
  • Superintendence 021-5
  • Workers 021-5
  • Resident Project Representative 021-5
  • Lines and Grades 021-7
  • Structures and Utilities Encountered 021-9
  • Pedestrians and Traffic 021-10
  • Bulkheads 021-11
  • Permanent Changes of Pipe or Other Structures 021-11
  • Temporary Sewer Connections 021-11
  • Locations for Stub Sewers 021-11
  • Correction of Work 021-11
  • Sales Tax 021-12
  • Sanitation 021-12
  • Final Cleaning and Final Inspection 021-12
  • Cleaning Up 021-12
  • Rights of the Sanitary District 021-13
  • Termination for Breach 021-13
  • Separate Contracts 021-14
  • Definition of Notice 021-4
  • Extra, Additional or Omitted Work 021-14
  • Deduction for Uncorrected Work 021-14
  • Liens 021-14
  • Time 021-15
  • Liquidated Damages 021-15
  • Notice to Suspend Work 021-15
  • Unavoidable Delays 021-16
  • Assignment of Contract 021-16
  • General Requirements Relating to Rights of Way 021-16
  • Future Streets 021-19
  • Temporary Structures 021-19
  • Storage 021-20
  • Shop Drawings 021-20
  • Reference Standards 021-16
  • Interference Drawings 021-16
  • Manufacturer’s Directions 021-21
  • Project Record Documents 021-21
  • Patents, Trade Secrets, Copyrights 021-21

SECTION 023

SPECIFICATIONS – GENERAL

  • Access to Job Sites 023-1
  • Materials Inspection 023-1
  • Protection of Work 023-1

SECTION 027

SPECIFICATIONS – PIPE MATERIALS FOR SEWERS

  • Clay Pipe 027-1
  • Prestressed Concrete Cylinder Pipe 027-1
  • PVC Pipe – General 027-1
  • PVC Pipe for Gravity Sanitary Sewers 027-2
  • PVC Pipe for Force Main Sewers 027-2
  • Restrained Joint PVC Pipe 027-2
  • Ductile Iron Pipe 027-3
  • High Density Polyethylene Pipe 027-3

SECTION 031

SPECIFICATIONS – BUILDING INLETS

  • Building Inlets 031-1
  • PVC Tees 031-1
  • Sewer Tapping 031-1
  • Service Risers 031-2
  • Plugs 031-2

SECTION 035

SPECIFICATIONS – PIPE INSTALLATION

  • General 035-1
  • Requirements for Specific Pipe Materials 035-1
  • Staking 035-3
  • Excavation 035-3
  • Bedding 035-4
  • Placement of Fill or Embankment 035-4
  • Laying Pipe – General 035-5
  • Force Mains 035-6
  • Water Removal 035-6
  • Rock Excavation 035-7
  • Explosives 035-7
  • Joining Pipes of Dissimilar Materials 035-7
  • Connection to Existing Sewer 035-7
  • Erosion Control 035-8

SECTION 039

SPECIFICATIONS – INSPECTION AND TESTING OF SEWERS

  • Gravity Sewers 039-1
  • Force Main Sewers 039-3
  • Repairing Leaks 039-3

SECTION 043

SPECIFICATIONS – MANHOLES

  • General 043-1
  • Standard Manhole 043-1
  • Drop Manhole 043-2
  • Splash-Drop Manhole 043-2
  • Special-Type Manhole 043-2
  • Manhole Testing 043-2

SECTION 047

SPECIFICATIONS – BACKFILLING

  • General 047-1
  • Backfilling – Compaction Methods 047-1
  • Backfilling for Structures 047-2
  • Backfilling, Course Aggregate and Fine Aggregate Materials 047-2
  • Backfilling Under Roadways 047-3
  • Testing of Backfill 047-3
  • Abandonment of Sewers with Flowable Backfill 047-4

SECTION 051

SPECIFICATIONS – SEWER CONSTRUCTION BY JACKING AND TUNNELING

  • Sewer Construction by Tunneling 051-1
  • Sewer Construction by Jacking 051-1

SECTION 055

SPECIFICATIONS – RESTORATION

  • General 055-1
  • Roadway Restoration 055-1
  • Restoration of Concrete Sidewalks, Curbs, Gutters and Medians 055-5
  • Temporary Sidewalk Surface Restoration 055-6
  • Restoration of Driveways 055-6
  • Restoration in Non-Roadway Areas 055-6
  • Agricultural Surface Restoration 055-7

SECTION 059

SPECIFICATIONS – SEEDING AND SODDING

  • Preparing for Sodding and Seeding 059-1
  • Seeding 059-1
  • Sodding 059-3

SECTION 063

SPECIFICATIONS – CURED-IN-PLACE PIPE

  • Scope of Work 063-1
  • Public Notification 063-1
  • Sewer Line Preparation 063-2
  • Sewer Line Inspection 063-2
  • Sewer Flow Control 063-2
  • Cured-In-Place Pipe 063-2

SECTION 067

SPECIFICATIONS – GABIONS, REVET MATTRESSES, AND RIPRAP

  • Description 067-1
  • Rock for Gabions and Revet Matresses 067-1
  • Woven Wire Mesh Baskets 067-1
  • Woven Wire Mesh Basket Gabion Installation Instructions 067-4
  • Woven Wire Mesh Basket Mattress Installation Instructions 067-6
  • Welded Steel Wire Mesh Baskets 067-8
  • Riprap 067-10

SECTION 071

SPECIFICATIONS – HORIZONTAL DIRECTIONAL DRILLING

  • Experience Requirements 071-1
  • Pre-Construction Submittals 071-1
  • Materials for Directional Drilling 071-2
  • Execution of Directional Drilling 071-2

SECTION 079

SPECIFICATIONS – PIPE-BURSTING

  • High Density Polyethylene Pipe 079-1
  • Pneumatic Pipe-Bursting 079-1
  • Joining 079-4
  • Testing 079-5

SECTION 091

SPECIFICATIONS – CONCRETE

  • Concrete 09-1
  • Materials 09-1
  • Concrete Proportioning 09-2
  • Quality Control Testing 09-2
  • Mixing and Placing Concrete 091-3
  • Finishing Concrete 091-3
  • Curing Methods 091-4
  • Miscellaneous Items 091-4

SECTION 093

SPECIFICATIONS – CLEANING AND TELEVISING OF SANITARY SEWERS

  • Scope of Work 093-1
  • Sewer Flow Control 093-1
  • Sewer Pipeline/ Manhole Cleaning 093-2
  • Television Inspection, Videotaping and Recording 093-8
  • Locating and Raising of Manholes, Lampholes and Flush Tanks 093-16
  • Raising and Chipping Out Manholes 093-16

SECTION 095

SPECIFICATIONS – DETAIL DRAWINGS

  • Index of Detail Drawings 095-i

SECTION 099

SPECIFICATIONS – TRAFFIC CONTROL

  • General 099-1
  • Standards 099-1

GPSD Affirmative Action Requirements

IDOT Highway Design Standards for Traffic Control

IDOT Quality Standard for Work Zone Traffic Control Devices